Powering Industries, Empowering Sustainability
At GreatSun Power, we believe every rooftop has the potential to become a clean-energy powerhouse. Our recent 50 kW rooftop solar installation at NRM Sitapura, Jaipur showcases how industries can significantly cut energy costs while contributing to a greener planet.
⚡ Project Overview
| Project | Details |
|---|---|
| Client | NRM (Industrial Unit) |
| Location | Sitapura Industrial Area, Jaipur, Rajasthan |
| Capacity | 50 kW Rooftop Solar Power System |
| Type | Grid-tied Rooftop Installation |
| Commissioned By | GreatSun Power |
| Estimated Annual Generation | ~72,000 kWh |
| Annual CO₂ Savings | Over 60 tons per year |
🔧 Engineering & Design
The system was engineered to deliver maximum efficiency and long-term reliability, tailored to Rajasthan’s hot and dusty climate.
Key highlights:
-
Tier-1 monocrystalline solar panels for high conversion efficiency.
-
Smart string inverters to ensure optimized generation across all modules.
-
Aluminium-based mounting structures designed for wind resistance.
-
Comprehensive performance monitoring system with real-time data tracking.
Our design team conducted a shadow analysis and structural study to achieve ideal tilt and orientation, maximizing daily sunlight exposure.
💰 Financial & Environmental Impact
Switching to solar wasn’t just an environmental decision — it made strong business sense for NRM.
Key outcomes:
-
Up to 80% reduction in electricity bills.
-
Payback period: 3–4 years.
-
System life: 30+ years.
-
Total savings over lifetime: ₹35–40 lakhs (approx.).
-
CO₂ reduction: 60 tons annually — equivalent to planting 2,700 trees every year.
“GreatSun Power’s professional approach and commitment helped us transition to solar smoothly. The system performs exactly as promised.”
— Facility Head, NRM Sitapura
🧰 Installation Process
-
Site Assessment & Feasibility Study
Evaluation of rooftop structure, load capacity, and power consumption pattern. -
Custom Design & Engineering
Tailor-made solution optimized for shadow-free zones and maximum yield. -
Procurement & Installation
High-quality components sourced from trusted manufacturers. -
Testing & Commissioning
Performance testing, grid synchronization, and client training. -
Ongoing Support
Annual maintenance contract (AMC) ensuring uninterrupted operation.
🌍 Sustainability in Action
The NRM Sitapura project contributes directly to Rajasthan’s renewable-energy goals under the Jawaharlal Nehru National Solar Mission.
By generating clean electricity on-site, the client minimizes grid dependency and sets an example for other industrial units in Jaipur.
This project reinforces GreatSun Power’s role as a trusted EPC partner for industrial and commercial solar solutions across Rajasthan.
💬 Why Choose GreatSun Power for Industrial Rooftop Solar?
| Advantage | Description |
|---|---|
| Expert EPC Team | In-house design, installation & maintenance |
| End-to-End Execution | From site survey to subsidy assistance |
| Proven Track Record | Successful projects across Rajasthan |
| Local Presence | Quick response and after-sales support |
| Focus on ROI | Transparent pricing + high-efficiency systems |
☀️ The Future is Solar
The success of this installation inspires more industries to adopt clean energy.
GreatSun Power continues to partner with businesses, schools, and institutions across India — helping them save money while protecting the environment.
📞 Contact GreatSun Power — Jaipur’s Trusted Solar Partner
🌐 www.greatsunpower.com
📧 info@greatsunpower.com | 📱 +91-9680833915, +91-9829418919